Chattisgarh Road Development Corporation
Consultancy services for the preparation of a Detailed Project Report (DPR) and project management for a two or more lane road project spanning 198.81 km in Chhattisgarh (Package-01)
Duration: 07/08/2015 – 02/03/2017.
Maharashtra State Road Development Corporation
Consultancy services for Project Management, including preparation of a Detailed Project Report (DPR) for selected road stretches (NH3-NH222-NH4) in Maharashtra, spanning 91.63 km for upgradation to two-lane with paved shoulder / four-lane configurations.
Duration: 26/07/2016 – 03/08/2018
Executive Engineer, PWD Division -South Kolhapur, Maharashtra
This consultancy project focuses on the feasibility study, preparation of a Detailed Project Report (DPR), and land plan preparation using LiDAR or similar advanced technology for the widening of key state highways in Maharashtra. The objective is to upgrade these roads to two-lane configurations with paved shoulders to enhance connectivity and road safety, under the Hybrid Annuity Model. Total Length: 105.466 km
Duration: 20/07/2017 To 04/07/2018
Indian Academy of Highway Engineers (IAHE), National Highways Authority of India (NHAI)
This project involves Project Management Consultancy (Phase-1), including the preparation of a Detailed Project Report (DPR) for the upgradation of the Nanded-Hingoli-Washim-Akola Section of NH-161 in Maharashtra. The objective is to enhance the existing highway to two/four lanes with paved shoulders, ensuring improved traffic flow, better connectivity, and enhanced safety for commuters.Total Project Length: 176.145 km
Duration: 22/05/2015 To 31/10/2021
Executive Engineer, PWD Division - Khamgaon, Maharashtra
This project focuses on the upgradation of the Warwat Undri-Ambetkali-Balapur Road to a two-lane configuration with paved shoulders, improving connectivity between the districts of Buldhana and Akola. This highway is a critical regional link supporting agricultural transportation and inter-district trade. The improved road will facilitate smoother travel, reduce traffic congestion, and enhance safety standards. Total Length:120.47
Duration: 20/07/2017 – 03/11/2017